1. Adzic, E., Porobic, V., Dumnic, B., Celanovic, N., Katic, V., “PLL Synchronization in Grid-connected Converters”,The 6th PSU-UNS International Conference on Engineering and Technology (ICET-2013), Novi Sad, Serbia, 1-5, 15-17 May 2013.
2. Amin, M. M., Mohammed O. A., “Software Phase Locked Loop Technique for Grid-connected Wind Energy Conversion Systems”, IEEE 12th Workshop on Control and Modeling for Power Electronics (COMPEL), Boulder, USA, 1-8, 28-30 June 2010.
3. Appleton, E. V., 1923, “Automatic Synchronization of Triode Oscillators”,Proc. Cambridge Phil. Soc.,Vol.21, No.3, pp. 231.
4. Aydemir, M., 2014, Rüzgâr Türbinlerinde Kullanılan DA/AA Evirici Modellenmesi ve Analizi, Yüksek Lisans Tezi, Gebze Yüksek Teknoloji Enstitüsü, Kocaeli.
5. Bellescize, H. de,1932, “La Reception Synchrone”,OndeElectr.,Vol. 11, pp. 230-240.