The Anchor-Robust Project Scheduling Problem

Author:

Bendotti Pascale12ORCID,Chrétienne Philippe2,Fouilhoux Pierre2ORCID,Pass-Lanneau Adèle12ORCID

Affiliation:

1. OSIRIS Department, Electricité de France Recherche & Développement, 91120 Palaiseau, France;

2. Centre National de la Recherche Scientifique, Operations Research Team, Laboratoire d’Informatique de Paris 6, Sorbonne Université, 75005 Paris, France

Abstract

In project scheduling, the durations of activities are often uncertain. Delays may cause a massive disorganization if a large number of activities must be rescheduled. In “The Anchor-Robust Project Scheduling Problem,” Bendotti, Chrétienne, Fouilhoux, and Pass-Lanneau propose a novel criterion for solution stability in project scheduling under processing times uncertainty. They define anchored jobs as jobs whose starting times can be guaranteed in a baseline schedule. Finding a project schedule with bounded makespan and a max-weight set of anchors is shown to be an NP-hard robust two-stage problem. Taking advantage of the combinatorial structure of project scheduling and budgeted uncertainty, the authors obtain a compact MIP formulation for the problem. Numerical results show that the obtained MIP outperforms standard techniques from the literature. They also showcase the practical interest of anchored jobs in project scheduling.

Publisher

Institute for Operations Research and the Management Sciences (INFORMS)

Subject

Management Science and Operations Research,Computer Science Applications

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3