Affiliation:
1. Department of Industrial Engineering and Management, Ben-Gurion University of the Negev, 84105 Beer-Sheva, Israel
Abstract
In this paper we consider the fundamental scheduling problem of minimizing the weighted number of tardy jobs on a single machine. We present a simple pseudo polynomial-time algorithm for this problem that improves upon the classical Lawler and Moore algorithm from the late 60’s under certain scenarios and parameter settings. Our algorithm uses (max,+)-convolutions as its main tool, exploiting recent improved algorithms for computing such convolutions, and obtains several different running times depending on the specific improvement used. We also provide a related lower bound for the problem under a variant of the well-known Strong Exponential Time Hypothesis (SETH). History: Accepted by Andrea Lodi, Area Editor for Design & Analysis of Algorithms – Discrete. Funding: This work was supported by the Israel Science Foundation [Grant 1070/20].
Publisher
Institute for Operations Research and the Management Sciences (INFORMS)