Periodic Event Scheduling for Automated Production Systems

Author:

Helmberg Christoph1ORCID,Hofmann Tobias1ORCID,Wenzel David2

Affiliation:

1. Chemnitz University of Technology, 09111 Chemnitz, Germany;

2. Leadec Industrial Services, 09120 Chemnitz, Germany;

Abstract

Consider optimizing a periodic schedule for an automated production plant as a last step of a more comprehensive design process. In our scenario, each robot’s cyclic sequence of operations and trajectories between potential waiting points have already been fully specified. Further given are those precedences that fix sequence requirements on operations between different robots. It remains to determine the starting time for each operation or movement of each robot within a common cyclic time period so as to avoid collisions of robots that operate in the same space simultaneously. So the task is to find a conflict-resolving schedule that minimizes this common periodic cycle time while observing all precedence relations and collision avoidance constraints. The proposed cycle time minimization problem for robot coordination has, to the best of our knowledge, not been studied before. We develop an approach for solving it by employing binary search for determining the smallest feasible period time of an iso-periodic event scheduling problem (IPESP). This is a variant of the periodic event scheduling problem in which the objects that have to be scheduled need to obey exactly the same period time. The possibility to wait arbitrarily long at waiting points turns out to be essential to justify the use of binary search for identifying the minimum cycle time, thereby avoiding bilinear mixed integer formulations. Special properties of the given scenario admit bounds on the periodic tension variables of an integer programming formulation. Although the IPESP subproblems remain NP-complete in general, these bounds allow solving real-world instances sufficiently fast for the approach to be applicable in practice. Numerical experiments on real-world and randomly generated data are supplied to illustrate the potential and limitations of this approach. Summary of Contribution: When designing automated production plants, a crucial step is to identify the smallest possible per unit period time for the production processes. Based on periodic event scheduling ideas, we develop and analyze mathematical methods for this purpose. We show that the algorithmic implementation of our approach provides an answer to current real-world designs in reasonable time.

Publisher

Institute for Operations Research and the Management Sciences (INFORMS)

Subject

General Engineering

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Forward and Line-Based Cycle Bases for Periodic Timetabling;Operations Research Forum;2023-06-23

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3