Simultaneous Production and Transportation Problem: A Case of Additive Manufacturing

Author:

Dwivedi Gourav1ORCID,Chakraborty Shuvabrata2,Agarwal Yogesh K.34,Srivastava Rajiv K.4

Affiliation:

1. Department of Management Studies, Indian Institute of Technology Delhi, New Delhi 110016, India;

2. Quantitative Methods and Operations Management, Indian Institute of Management Amritsar, Amritsar 143105, India;

3. Jaipuria Institute of Management, Lucknow 226010, India;

4. Indian Institute of Management Lucknow, Lucknow 226013, India

Abstract

Additive manufacturing (AM) promises considerable advantages over conventional manufacturing to meet the growing demand for customized products and faster delivery times. Consider a mobile mini-factory, that is, a vehicle equipped with an AM facility, which can simultaneously produce and transport the final products to the customers. The overlapping of production and transportation processes allows potential savings on customer delivery lead times and inventory holding costs, thereby facilitating on-demand fulfillment of the orders of intricate products. Based on this situation and motivated by a recent Amazon patent, we introduce a novel routing optimization problem called Simultaneous Production and Transportation Problem (SPTP) in this study. Given a set of customers and their respective orders with associated production time and delivery due dates, SPTP minimizes the trip time for the AM installed vehicle while meeting the customers’ stipulated due dates for all deliveries. We formulate the problem using a mixed integer linear program, discuss several valid inequalities to strengthen the formulation, and discuss a cutting-plane-based exact solution approach. We also design a variable neighborhood search metaheuristic to solve larger instances of SPTP very efficiently. The effectiveness of the exact and heuristic solution approaches is demonstrated using extensive computational experiments. The study also explores the interaction between production and travel times in SPTP and how the problem compares with the traveling salesman problem and the single machine scheduling problem, each of which may be viewed as special cases of SPTP. Further, the problem involves a trade-off between the total trip time and the tardiness of the deliveries. Therefore, an extension of the proposed formulation is also proposed with interesting managerial insights on identifying appropriate trip time-tardiness combinations using an illustrative example. Supplemental Material: The online appendices are available at https://doi.org/10.1287/trsc.2022.1195 .

Publisher

Institute for Operations Research and the Management Sciences (INFORMS)

Subject

Transportation,Civil and Structural Engineering

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A math-heuristic approach for scheduling the production and delivery of a mobile additive manufacturing hub;Computers & Industrial Engineering;2024-02

2. Scheduling of distributed additive manufacturing machines considering carbon emissions;An International Journal of Optimization and Control: Theories & Applications (IJOCTA);2023-11-03

3. Simultaneous Production and Transportation Problem to Minimize the Total Cost of Waiting Time and Tardiness;2023 IEEE International Conference on Networking, Sensing and Control (ICNSC);2023-10-25

4. The PSK Method;Advances in Logistics, Operations, and Management Science;2023-07-10

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3