Coordinating Project Outsourcing Through Bilateral Contract Negotiations

Author:

Hou Chengfan1,Lu Mengshi2ORCID,Deng Tianhu1ORCID,Shen Zuo-Jun Max3ORCID

Affiliation:

1. Department of Industrial Engineering, Tsinghua University, Beijing 100084, China;

2. Krannert School of Management, Purdue University, West Lafayette, Indiana 47907;

3. Department of Industrial Engineering and Operations Research and Department of Civil and Environmental Engineering, University of California, Berkeley, Berkeley, California 94720

Abstract

Problem definition: Project outsourcing has been a pronounced trend in many industries but is also recognized as a major cause for project delays. We study how companies can coordinate outsourced projects with uncertain completion times through bilateral contract negotiations. Academic/practical relevance: Misaligned subcontractor incentives may result in substantial losses to both project clients and subcontractors. Coordinating subcontractors’ efforts through proper contracts is imperative to the success of project outsourcing. Most previous studies on project contracting have not addressed subcontractors’ bargaining powers or the dynamic bargaining process in negotiations. We fill in this gap by studying bilateral bargaining between the client and subcontractors, which better reflects real-world negotiations. Methodology: We model project contract negotiations as a multiunit bilateral bargaining game. We derive the conditions such that bilateral negotiations can achieve system coordination and characterize the equilibrium negotiation outcomes. We then compare the conditions and equilibria under various model settings to study their impact on project contracting. Results: Our study uncovers how the coordination of project outsourcing is impacted by the contract form, bargaining power structure, precedence network topology, payment timing, external opportunities, and negotiation protocols. For single-task projects, the widely used fixed-price (cost-plus) contract can achieve system coordination only when the subcontractor (client) possesses full bargaining power. Cost-sharing and time-based incentive contracts, which perform well for single-task projects, may not be effective for projects with parallel tasks when any subcontractor’s bargaining power is sufficiently high. Projects with serial tasks can be coordinated only under certain extreme bargaining power structures. Delaying payments always exacerbates the incentive misalignment. Managerial implications: Our analysis provides insights and guidelines to companies regarding how to select proper contract forms and payment timing schemes, based on the characteristics of the projects and subcontractors, to ensure the effectiveness of project outsourcing. Our results also highlight the importance of bargaining modeling in project contracting.

Publisher

Institute for Operations Research and the Management Sciences (INFORMS)

Subject

Management Science and Operations Research,Strategy and Management

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3