Adaptive Capacity Planning for Ambulatory Surgery Centers

Author:

Youn Seokjun1ORCID,Geismar H. Neil2ORCID,Sriskandarajah Chelliah2ORCID,Tiwari Vikram3456ORCID

Affiliation:

1. Department of Management Information Systems, Eller College of Management, The University of Arizona, Tucson, Arizona 85721;

2. Department of Information and Operations Management, Mays Business School, Texas A&M University, College Station, Texas 77843;

3. Department of Anesthesiology, Schools of Medicine, Vanderbilt University, Nashville, Tennessee 37212;

4. Department of Biomedical Informatics, Schools of Medicine, Vanderbilt University, Nashville, Tennessee 37212;

5. Department of Biostatistics, Schools of Medicine, Vanderbilt University, Nashville, Tennessee 37212;

6. Department of Management, Owen Graduate School of Management, Vanderbilt University, Nashville, Tennessee 37212

Abstract

Problem definition: We develop a framework to plan capacity in each of three sequential stages for ambulatory surgery centers (ASCs). The interdependence of activities, their stochastic durations, and the uncertainties in patient-mix pose significant challenges to managing the capacity of each activity and to achieving a smooth patient ow by coordinating the stages for each patient's visit. These strategic and operational decisions must efficiently cover all variations of daily patient demand. The overall objective is to minimize the total cost incurred in satisfying this demand, where the total cost is defined as the sum of the overtime cost and the amortized construction cost for the three stages. Methodology/results: In contrast to the traditional top-down approach to capacity planning, our approach proposes a bottom-up strategy based on optimization methods and data analytics. Specifically, we model ASCs as hybrid ow shops (HFS) from the scheduling literature, then relax the fixed capacity assumption of traditional HFS problems by using the trade-o_ between the overtime cost and the amortized capacity construction cost. Because the HFS is strongly NP-hard, we develop a straightforward and easy to implement heuristic to find cost-efficient capacities for the three stages. Our computational study, informed by operational-level archival patient data, examines how stochastic business parameters, e.g., patient-mix, service durations, and overnight-stay probabilities, affect the capacity planning decision. Managerial implications: Timely capacity adjustment is important for ASC practitioners, but related research is limited. This study highlights the benefit of considering the three stages together for capacity planning, rather than focusing solely on the operating rooms. We expect our approach to guide the more than 5,700 ASCs in the U.S., which perform 23 million surgeries annually, to make appropriate investments that will improve ASC operations via capacity adjustment and patient scheduling. Funding: S. Youn and C. Sriskandarajah received financial support from the Mays Business School Grand Challenge Research Grant in 2017. Supplemental Material: The online appendix is available at https://doi.org/10.1287/msom.2022.1109 .

Publisher

Institute for Operations Research and the Management Sciences (INFORMS)

Subject

Management Science and Operations Research,Strategy and Management

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3