Flexibility and Consistency in Long-Term Care Rostering

Author:

Slaugh Vincent W.1ORCID,Scheller-Wolf Alan A.2ORCID

Affiliation:

1. SC Johnson College of Business, Cornell University, Ithaca, New York 14853;

2. Tepper School of Business, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213

Abstract

Problem definition: We consider the rostering decisions—that is, the assignment of workers scheduled for a shift to units—of a long-term care facility. The facility’s objective is to minimize the monthly inconsistency level, a widely promoted quality metric representing the number of different caregivers working in each unit over one month. Methodology/results: We introduce simple rostering heuristics that prioritize either part-time or full-time workers and present a stochastic model of the repeated rostering problem to compare the performance of different strategies analytically. Our analysis shows that in order to minimize the inconsistency level, part-time workers should receive higher priority than full-time workers for assignment to their home units. We also establish an analytical upper bound for a threshold on the time horizon above which a policy giving assignment priority to part-time workers is guaranteed to outperform one giving priority to full-time workers. Using data from more than 15,000 shifts worked by nursing assistants at three nursing homes, we compare the actual rosters to the hindsight optimal consistency-maximizing schedules, demonstrating a significant opportunity for improvement. We then compare the performance of our rostering heuristics via trace-based simulation of the historical schedules. This reinforces the superiority of prioritizing part-time workers, yielding reductions in the inconsistency level between 20% and 30% compared with the historical rosters. Managerial implications: Contrary to popular guidance, our results show that managers should focus on part-time workers and assign them as consistently as possible. Even if some full-time workers are always assigned to their home units (because of preferences or work rules), assignment flexibility among the remaining full-time workers still enables significant improvements in the consistency of care. This flexibility among full-time workers helps because their higher work frequency tends to make a reassignment away from their home unit contribute less to inconsistency, because they are able to work multiple shifts in these nonhome units. Supplemental Material: The e-companion is available at https://doi.org/10.1287/msom.2022.1174 .

Publisher

Institute for Operations Research and the Management Sciences (INFORMS)

Subject

Management Science and Operations Research,Strategy and Management

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3