Multistage Stochastic Power Generation Scheduling Co-Optimizing Energy and Ancillary Services

Author:

Huang Jianqiu1,Pan Kai2ORCID,Guan Yongpei3

Affiliation:

1. Department of Industrial and Systems Engineering, University of Florida, Gainesville, Florida 32611;

2. Department of Logistics and Maritime Studies, Faculty of Business, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong

3. Department of Industrial and Systems Engineering, University of Florida, Gainesville, Florida 32611

Abstract

With the increasing penetration of intermittent renewable energy and fluctuating electricity loads, power system operators are facing significant challenges in maintaining system load balance and reliability. In addition to traditional energy markets that are designed to balance power generation and load, ancillary service markets have been recently introduced to help manage the considerable uncertainty by reserving certain generation capacities against unexpected events. In this paper, we develop a multistage stochastic optimization model for system operators to efficiently schedule power-generation assets to co-optimize power generation and regulation reserve service (a critical ancillary service product) under uncertainty. In addition, to improve the computational efficiency of the proposed multistage stochastic integer program, we explore its polyhedral structure by investigating physical characteristics of individual generators, the system-wide requirements that couple all of the generators, and the scenario tree structure for our proposed multistage model. We start with the single-generator polytope and provide convex hull descriptions for the two-period case under different parameter settings. We then provide several families of multiperiod strong valid inequalities linking different scenarios and covering decision variables that represent both power generation and regulation reserve amounts. We further extend our study by exploring the multigenerator polytope and derive strong valid inequalities linking different generators and covering multiple periods. To enhance computational performance, polynomial-time separation algorithms are developed for the exponential number of inequalities. Finally, we verify the effectiveness of our proposed strong valid inequalities by applying them as user cuts under the branch-and-cut scheme to solve multistage stochastic network-constrained power generation scheduling problems.

Publisher

Institute for Operations Research and the Management Sciences (INFORMS)

Subject

General Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3