Abstract
In this study, a job shop scheduling optimization model under risk has been developed to minimize the make span. This model has been built using Microsoft Excel spreadsheets and solved using @Risk solver. A set of experiments have been also conducted to examine the accuracy of the model and its effectiveness has been proven.
Publisher
Granthaalayah Publications and Printers
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献