CAUSES AND IMPACT OF DELAY IN CONSTRUCTION INDUSTRY OF INDIA

Author:

Vishalkranti.myneni@spav.ac.in ,Myneni Kranti kumar

Abstract

Delays can be well-defined as the escalation of the stipulated time for the completion of the project. Delay is always the major loss to any construction project. In construction projects delay is a very usual thing and it can have an adverse effect on the project’s time and cost. As construction is one of the largest economic activity in India, the effects of delay are still in millions, which surely decreases the GDP of the country. Delay makes the process tardy and management of delay is extremely challenging as most of the projects do not meet the expected requirement and fails to perform within time. Therefore, various types and causes of delays should be studied accurately. There are many researches on construction delays but they talk about the wide-ranging reasons of delay, so there stays a high requirement of a notable and feasible study on delays at different stages of construction process in India. The aim of the paper is to identify the causes of delays at different stages of construction through questionnaire survey in Indian construction industry. Analytical tools used in this research are relative importance index (RII) and spearman’s rank correlation coefficient to rank the sources of delay with respect to its occurrence in the various stages of the construction project. The study concludes based on the correlation coefficient analysis between the construction stages, that the delays associated with before-construction stage is least related, with after-construction stage is third highly related, with construction stage is second highly related and delays associated with average/overall construction is highly related.

Publisher

Granthaalayah Publications and Printers

Subject

General Earth and Planetary Sciences,General Environmental Science

Reference13 articles.

1. M. P. Anil Upadhyay, Vaishant Gupta, “A Case Study on Schedule Delay Analysis in Construction Projects in Gwalior,” International Research Journal of Engineering and Technology (IRJET), vol. 03, no. 05, pp. 1312–1315, 2016.

2. J. G. Zack and P. V. Badala, “Pricing contractor delay costs,” AACE International Transactions, vol. 2, pp. 876–894, 2012.

3. S. Haq, Y. Rashid, D. Ph, and M. S. Aslam, “Effects of Delay in construction Projects of Punjab-Pakistan: An Empirical Study Effects of Delay in construction Projects of Punjab-Pakistan:” Journal of Basic and Applied Scientific Research., vol. 3, no. January 2014, pp. 87–96, 2017.

4. Critical factors affecting schedule performance

5. Ministry of Statistics, “Ministry of Statastics and Programme Implementation, Annual Report 2019-2020,” Government of India, p. 142, 2020, [Online]. Available: http://mospi.nic.in/sites/default/files/publication_reports/Annual_Report_2019-2020_English.pdf.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3