Pushing the Limits of Gas Recovery Factor Through Holistic Integrated Network Modelling for Natural Depletion Drive Brown Fields

Author:

Yip P. M.1,Sinha A. K.1,Md Rabi R. B.1,Mohamad W. Wan1,Gaur V.1,Law H. A.1,Hamid A. B.2

Affiliation:

1. PETRONAS Carigali Sdn Bhd, Kuala Lumpur, Malaysia

2. Ex-PETRONAS Carigali Sdn Bhd, Kuala Lumpur, Malaysia

Abstract

Abstract Recovery factor in gas fields is heavily reliant on the abandonment pressure. As reservoir pressure declines and water cut increases, matured assets experience declining well productivity. Fields at a gas hub within Sarawak Basin faces immense challenge to maximize field recovery following an infill drilling evaluation study which indicated no further potential. This paper provides the details on the hub opportunity to lower the abandonment pressure identified from network modelling, optimization works and execution lessons learned. Started with the vision to sustain the gas hub production which was anticipated to cease production in year 2025, when production falls below turndown rate (TDR) of 60 MMscf/d, a gas hub network model has been setup to represent the gas hub configuration with 3 natural depletion drive gas fields tie-in to the export compressor, with the aim to assess the incremental gains and recoverables by lowering down the field abandonment pressure. Material balance (MBAL) model for the gas fields were developed and history matched with production data. The MBAL model was then incorporated into the gas hub network model in General Allocation Package (GAP) model. The network model prediction run results demonstrated up to 12% substantial gas recovery improvement, from lowering down the compressor operating envelope from 48 Barg to 20 Barg in 3 stages; 36-28-20 Barg from year 2021 to 2024, which subsequently reduces its compression capacity from 600 MMscf/d to 300-250-200 MMscf/d, via compressor change-out activities. The single to dual stage compressor change-out Phase 1 implementation has been declared a success with reserves addition beyond 60 MMBOE and prolonging the gas hub life till year 2030. Post execution field performances indicated comparable performances and volumes as per forecasted by the network model, leading to robust project economic returns. Good production attainability at 105% was achieved for the first 12 months of production. The reinstatement of 2 idle wells during the project execution has also proven the value-added benefits from the project. The fields have successfully executed compressor change-out Phase 2 in Q3 2023 and continuous evaluation using updated network model is performed to optimize the Phase 3 timing currently predicted to happen in 2026. Various useful lessons learned were captured during the phased implementation of this project, both operational and subsurface, which included lower CGR than prediction and capped flow rates due to compressor gas turbine exhaust temperature limitation. As part of a continuous improvement process, all lessons learned were documented to be integrated into the network model updates, to improve future projects and to ensure good practices are replicated for future applications in PETRONAS.

Publisher

IPTC

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3