Chemical Sand Consolidation and Through-Tubing Gravel Pack, the Effective Alternative Sand Control Methods in Zawtika Field

Author:

Peerakham Chatchanakorn1,Haripogepornkul Nopparerk1,Putthaworapoom Natthapon1,Direkmahamongkol Suwit1,Thanasutives Patana1,Zin Ko Ko Thaw1,Lin Tun Zin1

Affiliation:

1. PTTEP International Limited Yangon Branch

Abstract

AbstractSand production has been highlighted as one of the critical challenges for Zawtika Project. Throughout the years of field experiences, sand production management has brought up many challenges, especially in terms of field potential sustaining, well productivity and investment justification. Alternative sand control technique is one of the keys to overcome these challenges with continuous improvements driven by lessons learnt.Chemical Sand Consolidation (CSC) is the chemical sand control technique using the resin to bond the formation grain and strengthen the formation strength whereas Thru-Tubing Gravel Pack (TTGP) is retrofit sand control method, which the sand control principle is similar to conventional Cased-Hole Gravel Pack (CHGP), but can be installed in a smaller completion size. In Zawtika existing development phases, almost 150 zones of sand producing intervals are handled by CHGP completion design. In addition to CHGP, these mentioned alternative sand control techniques have been successfully implemented in 3.5-inch-tubing monobore completion for selected deep reservoir intervals after some degree of depletion.Field trial of CSC and TTGP had been implemented during 2019-2020 with 5 reservoirs in 7 monobore completion wells (4 CSC wells and 3 TTGP wells). All wells showed positive results with no sand production from the post-job production; and with a reasonable increase in Maximum Allowable Sand Free Rate (MASR). Based on well performance monitoring until early of 2022, all 3 TTGP wells as well as 3 CSC wells no longer have any sand production issue. Nevertheless, only 1 CSC well with water production history record prior to CSC implementation shows poorer performance on sand production prevention.Following the positive results of TTGP from the previous campaign in term of sand production prevention and well life extension, 8 more TTGP well candidates have been implemented in early of 2022. At the early phase of production, sand free production has been observed for all wells with 51 mmscfd incremental MASR.With all aspects of technical and fiscal evaluation proven to be successful, sand retention and production performance of CSC and TTGP are continuously monitored to confirm long-term performance efficiency for full application in the future.Zawtika sand management strategy through alternative sand control completion has been improved upon accumulated lesson learns and production experiences. The lesson learns and experiences from both operation and well performance monitoring will be integrated for further improvement for the next implementation phases. Maximizing gas potential through alternative sand control methods is also believed to be the cost-effective approach which strengthens PTTEP's competitive performance.

Publisher

IPTC

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3