Erosion Mitigation During Testing of High Deliverability Gas Well - A Case Study

Author:

Bashir I. A.1,Inam S.1,Sana-ul-Hussnain M.1,Shafee I.1,Aijaz M.1,Ullah R.1,Haider M.1,Qureshi H. A.1,Khan M.1,Ahmad H.1,Awan F. R.1

Affiliation:

1. Mari Petroleum Company Limited, Islamabad, Pakistan

Abstract

Abstract The paper details the case history of a highly challenging, high deliverability exploratory gas well that was successfully drilled and completed in the frontier region. The 4,900 m well encountered multiple reservoirs during drilling with severe losses in the topmost prospective limestone reservoir formation. Subsequently, well was cased and Drill Stem Test (DST) was performed to test reservoir deliverability. During testing, severe leakages were encountered at the Surface Well Test (SWT) equipment due to high flow velocities, coupled with Loss Control Material (LCM) and formation cuttings flowback. This led to internal erosion in the equipment, resulting in frequent uncontrolled hydrocarbon release into the atmosphere, posing a high risk for personnel. Consequently, frequent shut-ins for maintenance were necessary. Steps taken to mitigate this issue are discussed and recommendations are proposed for future encounters. A systematic approach was adopted to offset the effects of erosion and consequential leakages. Points were identified which were prone to leakages, and successively, steps were taken to minimize bends. Non-intrusive thickness monitoring was carried out regularly to detect reduction(s) in the pipe schedule preemptively and take appropriate measures. Erosional velocities were computed for different pipe sections and sufficient back pressure was applied to reduce flow velocity. Other measures such as reducing flowing times at higher chokes and acid stimulation were also carried out to minimize the impact of, and dissolve, the particles eroding the equipment. Significant improvements were observed after taking preventive measures – Non-Productive Time (NPT) was reduced, and the remaining job was carried out safely without any impact on the personnel, equipment, environment and the Company reputation. Accuracy of the collected data also improved, as particles had inadvertent effects on flow measurements. An extensive study was carried out followed by on site actions to reduce the erosional impacts on a high pressure, high deliverability gas well. Important conclusions were drawn. Safe practices were developed to avoid future occurrences in high volume wells. A combination of steps such as re-arrangement of SWT setup to minimize bends, monitoring pipeline thickness using ultrasonic thickness meter, minimizing flow duration at high chokes, calculating downstream pressures required to limit erosion and applying back pressure, and performing acid stimulation can all help future operations to be carried out safely without any untoward downtime. In addition, dissolvable / degradable LCM could be opted in future wells, and wellbore hydraulics could be further studied to ensure optimum hole cleaning for effective cuttings removal.

Publisher

IPTC

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3