Breaking Oil Recovery Limit in Malaysian Thin Oil Rim Reservoirs: Water Injection Optimization

Author:

Chan Keng Seng1,Kifli Azmukiff Muhammed1,Darman Nasir B.1

Affiliation:

1. Petronas

Abstract

Abstract The goal of an oil field development project is to accelerate the hydrocarbon production and maximize the recovery at a lowest cost. For a thin oil rim reservoir with a large gas cap on top and a strong aquifer below, achieving such goal can be very challenging since recovery of both oil and gas shall be maximized. A successful project shall entail plan first to accelerate the oil production maximizing the oil recovery prior to the gas cap blow-down. The maximum oil recovery factor achievable in thin oil rim reservoirs was evaluated for a Malaysian thin oil rim reservoir. The force balance between the gas cap expansion, aquifer expansion and viscous withdrawal was demonstrated by showing the model simulated water-oil and gas-oil contact movement. The understanding of the force balance progressively guided the field development project team to selectively re-activate some of the idle wells, to selectively place new additional infill horizontal wells, and to plan selective water and gas injection in key reservoir sectors. In this paper, the concept and strategy of water injection for a subject thin oil rim reservoir was delineated. Placement of a system of water injectors at the selected sector periphery and at the gas oil contact was studied. Together with optimization of infill well placement and the selected idle well reactivation, this effort showed a potential of improving the current recovery factor from 35% up to 51%, way beyond the maximum theoretical vertical displacement efficiency. In addition, it can be shown that successful water injection can improve productivity of production wells due to increasing near wellbore oil saturation. Introduction For thin oil rim reservoirs in Malaysia, the key force balance is between the gas cap and aquifer expansion, and the fluid withdrawal by well production, in addition to the capillary and gravitational forces. The understanding of the force balance in the reservoir will lead towards a better optimization of reservoir oil and gas production, achieving a higher recovery factor, and generating a good investment plan (Ref. 1). The study in this paper will focus on the Seligi field in Malaysia. It is located offshore Terengganu and was progressively developed starting in 1978 as an oil field. It is a combination of stratigraphic and heterogeneous structural traps (Figure 1). It has a huge regional aquifer and 5 distinctive gas caps (Figure 2) at the time of discovery/development with a significant amount of oil in place (Ref. 2). Seligi field was developed with the concept of produced gas re-injection at the gas caps. Typically, 75% of the produced gas was re-injected via 15 gas injectors at the 5 gas caps. However, the subject oil rim reservoir pressure has been declining gradually as oil being produced (Figure 3).

Publisher

IPTC

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3