Hybrid Power Generation for Offshore Wellhead Platform: A Starting Point for Offshore Green Energy

Author:

Rongsopa Roongwit1

Affiliation:

1. PTT Explor and Prod PLC

Abstract

Abstract The purpose of this paper is to present the DC power supply for unmanned remote wellhead platforms (WHP). In several recent WHP projects, there are a number of difference aspects in Bongkot and Arthit Fields in the PTTEP's Gulf of Thailand and one of them is the DC power supply. PTTEP by Wellhead platform department intends to standardize the design of DC power generation for Generic Wellhead Platforms (Generic WHP) for either Bongkot or Arthit fields. Offshore wellhead platforms have been powered by various power generation technologies such as Gas engine generator, Diesel engine generator, Closed cycle vapor turbogenerator (CCVT), Thermoelectric generator (TEG) including renewable energy technologies such as Solar power system and Wind turbine generator. Both Solar power system and TEG are widely used as DC power generation for offshore remote wellhead platforms to power platform DC loads such as PLC, SCADA, and Radio system. Technical evaluation for various DC power supply will be presented. The scope of this paper is to discuss and recommend the most suitable DC power generation configuration for the Generic Wellhead Platforms focus on techno-economic with consideration of optimum point of reliability, economy, and environment. In addition, all calculations of system equipment sizing for the selected DC power generation configuration for generic WHP will be detailed in this paper. 1. Introduction The existing wellhead platforms (WHPs) of PTTEP in Bongkot and Arthit field are equipped with various types and configurations of DC power generation system. The Bongkot WHPs in old phase (e.g. phase 3E, 3F and 3G) are equipped with Closed Cycle Vapour Turbogenerator (CCVT) as main DC power generation, while the recent development Bongkot WHPs phase 4A are equipped with Thermoelectric Generator (TEG). The TEG system has been also installed in Arthit WHPs phase 1A (i.e. AWP 2–6). During design development for Arthit WHPs phase 1B (i.e. AWP 7–10), the Solar & TEG hybrid DC power system was first introduced and implemented as main DC power generation system for PTTEP WHPs in order to improve platform power availability and reliability. The Solar & TEG hybrid DC power system has been continuously used for recent Arthit WHP development project such as Arthit North project.

Publisher

IPTC

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Feasibility Study on Hybrid Renewable Energy to Supply Unmanned Offshore Platform;Sustainable Electrical Power Resources through Energy Optimization and Future Engineering;2018

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3