Abstract
Abstract
Abundant faults, long oil-bearing intervals (up to 500m), and diverse fluids including conventional oil and heavy oil, result in P oilfield became one of the most complex oil fields in the Bohai Bay. The main characters ofinitial development plan are directional well with commingle production, open hole completion, large draw down, high oil production rate, and reverse nine-point well pattern. At present, the oilfield has entered a stage of high water cut, with average water cut more than 85%. What can we do next, decommissioning or rebirthing?
An integrated solution was proposed to redevelop the oilfield which focus on the layers’ subdivision, the fine description of the sand body,a large number of horizontal wells on the top of the water-flooded layer are used to tap the potential, increase the water injector to transform the stream lines and rebuild the reservoir pressure, and search for potential sand bodies to increase reserves.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献