1. American Petroleum Institute: API Recommended Practise 7G (RP 7G), Recommended practice for drill stem design and operating limits, 15th Edn., Washington, 1995.
2. Baryshnikov, A. and Baragetti, S.: Rotary shouldered thread connections: Working limits under combined static loading, J. Mech. Design, 123, 456–463, 2001.
3. Gong, W.: Relation of the sealing ability of casing threads to connenction stress, China Petrol. Mach., 23, 27–36, 1995.
4. Griffin, R. C., Kamruzzaman, S., and Strickler, R. D.: Casing drilling drill collars eliminate down hole failures, in: Offshore technology conference, OTC 16596, 3–6 May 2004, Houston, Texas, 1–7, 2004.
5. Li, F., Hu, J., Li, Y., Hang, L., and Wang, X.: Development and application of Ø 73 mm direct-connected drill pipe, China Petrol. Mach., 39, 57–60, 2011.