1. AMEC (AMEC Earth & Environmental): TDR Trench Investigation and cable Installation Report, McMicken Dam Post Design Completion, Prepared for the Flood Control District of Maricopa County, Arizona, Contract FCD 2004C068, Work Assignment No. 1, 11 April 2006.
2. AMEC (AMEC Earth & Environmental, Inc.): McMicken Dam Instrumentation & Monitoring Plan (Revision 2), Prepared for the Flood Control District of Maricopa County, Arizona, Contract FCD 2008C016, Work Assignment No. 8. AMEC Job No. 09-117-01038, 18 June 2010.
3. AMEC (AMEC Earth & Environmental, Inc.): Subsidence and Earth Fissure Risk Zoning Report, Final Design Level Geohazard Investigation, McMicken Dam, Prepared for the Flood Control District of Maricopa County, Arizona, Contract FCD 2011C005, Work Assignment No. 4, 28 February 2013.
4. AMEC (AMEC Earth & Environmental, Inc.): Final Feasibility Study, I&W Brine Cavern, Carlsbad, New Mexico, Prepared for the Oil Conservation Division, New Mexico Energy, Minerals, and Natural Resources Department, available at: ftp://164.64.106.6/Public/OCD/Documents/I&W Brine Cavern Project/I&W Brine Cavern Project - Feasibility Study Final/I&W Feasibility Study_Final_081114.pdf, August 2014.
5. Beckwith, G. H., Slemmons, D. B., and Weeks, R. E.: Use of Low-Sun Angle Photography for Identification of Subsidence Induced Earth Fissures in Land Subsidence, in: Land Subsidence, edited by: Johnson, A. I., Proceedings of the Fourth International Symposium on Land Subsidence, 12–17 May 1991, Arvada, CO, Oxfordshire, UK: International Association of Hydrological Sciences Press, IAHS Publication No. 200, 261–269, 1991.