1. He, X., Wu, Y., and Jiang, G.: Profit allocation model of supply network based on revised Shapely value, Soft Science, 28, 70–73, 2014.
2. Howson, H. R. and Sancho, N. G. F.: A new algorithm for the solution of multi-state dynamic programming problems, Math. Program., 8, 104–106, 1975.
3. Li, Y., Zhou, J., Zhang, S., Huang, C., and Yan, D.: Combined dispatching chart of cascade hydropower stations on Yalong river, Jinsha river and Yangtze river, Journal of Hydroelectric Engineering, 35, 32–40, 2016.
4. Wang, Y., Guo, S., Zhou, Y., Hong, X., Hu, T., and Liu, D.: Uncertain analysis of long-term generation optimal operation for reservoirs, Water Resources and Power, 32, 61–65, 2014.
5. Xu, W.: Research on some issues in the joint optimal operation of cascaded reservoirs between Long yang xia and Liu jia xia, Tsinghua University, 2015.