Collaborative modelling for active involvement of stakeholders in urban flood risk management
-
Published:2012-09-12
Issue:9
Volume:12
Page:2821-2842
-
ISSN:1684-9981
-
Container-title:Natural Hazards and Earth System Sciences
-
language:en
-
Short-container-title:Nat. Hazards Earth Syst. Sci.
Author:
Evers M.,Jonoski A.,Maksimovič Č.,Lange L.,Ochoa Rodriguez S.,Teklesadik A.,Cortes Arevalo J.,Almoradie A.,Eduardo Simões N.,Wang L.,Makropoulos C.
Abstract
Abstract. This paper presents an approach to enhance the role of local stakeholders in dealing with urban floods. The concept is based on the DIANE-CM project (Decentralised Integrated Analysis and Enhancement of Awareness through Collaborative Modelling and Management of Flood Risk) of the 2nd ERANET CRUE funding initiative. The main objective of the project was to develop and test an advanced methodology for enhancing the resilience of local communities to flooding. Through collaborative modelling, a social learning process was initiated that enhances the social capacity of the stakeholders due to the interaction process. The other aim of the project was to better understand how data from hazard and vulnerability analyses and improved maps, as well as from the near real-time flood prediction, can be used to initiate a public dialogue (i.e. collaborative mapping and planning activities) in order to carry out more informed and shared decision-making processes and to enhance flood risk awareness. The concept of collaborative modelling was applied in two case studies: (1) the Cranbrook catchment in the UK, with focus on pluvial flooding; and (2) the Alster catchment in Germany, with focus on fluvial flooding. As a result of the interactive and social learning process, supported by sociotechnical instruments, an understanding of flood risk was developed amongst the stakeholders and alternatives for flood risk management for the respective case study area were jointly developed and ranked as a basis for further planning and management.
Publisher
Copernicus GmbH
Subject
General Earth and Planetary Sciences
Reference44 articles.
1. Abbott, M. B.: Stakeholder participation in creating infrastructure, New Civil Engineer, 160, 1, 26–32, Inst. Civil Engineers, London, 2007. 2. Allitt, R., Blanksby, J., Djordjeviç, S., Maksimoviç, \\`{E}., and Stewart, D.: Investigations into 1-D-1-D and 1-D-2D urban flood modelling, Paper presented at the WaPUG Autumn Conference, Blackpool, UK, 2009. 3. De Bruijn, K., Klijn, F., Mens, M., McGahey, C., and Wolfert, H.: Long-term strategies for flood risk management: Scenario definition and strategic alternative design, FLOODsite report T14-08-01, 2008. 4. Centre for Ecology and Hydrology: (formerly the Institute of Hydrology), Flood Estimation Handbook, Wallingford, Oxfordshire, UK, 1999. 5. Chen, S. and Hwang, C.: Fuzzy Multiple Attribute Decision Making, Lect. Note. Econom. Math. Syst., Springer-Verlag, No. 375, 1992.
Cited by
66 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
|
|