Author:
Oleinik Pavel,Yurgaytis Alexey
Abstract
In the article, the authors consider the problems of complex algorithmization and systematization of approaches to optimizing the work plans of construction organizations using various modern tools, including, for example, evolutionary algorithms of “conscious” enumeration of options for solving a target function from an array of possible constraints for a given nomenclature. Various standard schemes for modeling the processes of distribution of labor resources between the objects of the production program are given. As the results of the study, the authors formulate the conceptual algorithm underlying the written software package for the operational harmonization of the production program (work plans) in accordance with the loading of production units, released labor resources and other conditions stipulated by the model.
Reference11 articles.
1. McConnell J., Fundamentals of modern algorithms (Technosphere, Moscow, 2004)
2. Development of infrastructure of support of small and medium business
3. Dorigo M., Stutzle T., Handbook of Metaheuristics (2003)
4. Ant system: optimization by a colony of cooperating agents
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献