The Application of Analytical Hierarchy Process (AHP) to Determine The Construction Project Risk

Author:

Wijayaningtyas Maranatha,Megania Orissa Yukrista,Munasih

Abstract

Realisation of implementation also has various risk levels that affect project delays, as a result of which project performance is disrupted and causes losses to costs, time and quality of work. This research location is in a construction project at the vehicle test service office, which aims to identify, analyse, evaluate and mitigate risks using the AHP methods. However, the Risk Breakdown Structures method was first conducted to compile a structured description of project risk identification based on risk categories and subcategories. The collected data were analysed using the AHP method to obtain the dominant risk, then mitigate risk by interviewing experts and validating from various sources so that it becomes the basis for conclusions. The risk of delay in the construction project includes four risk categories and twenty subcategories analysed using the AHP method. The results of processing the data on the dominant risk of uncertainty are the increase in the price of building materials by 10.172%, the rise in fuel prices by 7.835%, and the delay in handing over land by 6.710%. As for risk mitigation, construction providers implement and create strategies to save fuel use and generate work methods regarding the scope and time of project implementation.

Publisher

EDP Sciences

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3