Abstract
The stages of formation of the mechanism of mobile construction and its role in solving major economic problems are considered. The article analyzes the effectiveness of mobile units in agricultural and water management, transport construction. The author emphasizes a fundamentally new approach to mobile construction using the complete-block method of construction of buildings and structures. As an example, the author reveals the experience of construction of the Astrakhan gas processing plant, which illustrates the synthesis of mobile methods of work organization and industrial space-planning solutions in the form of large blocks of technological equipment devices and installations. At the same time, specific engineering solutions for the preparatory period of construction, characteristics and composition of the residential settlement built in the process of pioneer development of the territory are given.
Reference11 articles.
1. Andrienko V. G. et al. Industrialization of construction of oil and gas industry facilities (Nedra, Moscow, 1985)
2. Kurits S. Ya., Block-complete construction in the oil and gas industry (Nedra, Moscow, 1977)
3. Development of investment infrastructure as the factor of the increase in investment attractiveness of the region
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献