Author:
Saengsupavanich Cherdvong,Chitsom Lanlila,Sanitwong-Na-Ayutthaya Sarinya,Iamraksa Phansak,Wangtong Salisa,Suknoi Kanjana,Yamongkol Thanchanok,Tiamsawat Yanticha,Ketin Weerapat,Krutta Kamonchanok
Abstract
It is undeniable that a mega port is important to the nation’s economy and its population. On the other hand, a port construction creates numerous environmental impacts. To achieve sustainable development, environmental mitigation measures need to be strictly followed. Since a mega port is constructed once in many decades, a case study during the port construction, like this article, is very rare. Our article presents how Thailand protects its surrounding environment during the construction of Laem Chabang Port (the biggest container port in the country), phase 3. The phase3 reclamation construction started in May 2021 and is expected to be completed in 2025. However, only land-based physical and biological environmental mitigation measures are presented because of the page limit. The land-based environmental impacts are mostly related to truck driving, truck exhaust, road maintenance and cleanliness, noise, dust, and vibration. This article shows that the joint-venture contractor of the reclamation project realizes the necessity of caring for society and the environment.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献