1. On the General plan of the city of Rudny, Kostanay region (including the main provisions) – IPS “Adilet” (zan.kz ).
2. Construction regulations of the Republic of Kazakhstan 4.01–03–2011 (eikos.kz ).
3. SP RK 2.04–01–2017 Construction Climatology (igis.kz ).
4. On approval of the unified classification system of water quality in water bodies – IPS “Adilet” (zan.kz).
5. 625e2ed8a6d23inf–byulleten–kostanay–mart.pdf (kazhydromet.kz).