1. Nanzad Ts., Development of ways to reduce the cost of mining rock masses by quarry excavators. (Ulaanbaatar 2013)
2. Nanzad Ts. Excavator operation quality management. (Ulaanbaatar 2013)
3. McCalley Jim., Jiang Yong., Honavar Vasant, Pathak Jyotishman. and others. Automated Integration of Condition Monitoring with an Optimized Maintenance Scheduler for Circuit Breakers and Power Transformers. (PSERC Publication 2006)
4. Ji Q. and Sanford R. L. Autonomous excavation of fragmented rock using machine vision. (Society for Mining, Metallurgy & Exploration Inc., Littleton CO, U.S.A., 1993)
5. Takahashi H.,Kamata H.,Masuyama T., and Sarata S. Autonomous shoveling of rocks by using image vision system on LHD. International Conference on Mine Mechanization & Automation, 1.33–1.44, (1998)