Author:
Kurbanov Azizali,Nazaraliyev Dilshod,Kurbanov Azamat,Jumaboyeva Gulnora,Islomov Karim,Gulkhayo Yakubova
Abstract
The article discusses methods for ensuring guaranteed water intake and the process of sedimentation in the head sedimentation tank. Based on the results of a full-scale study of the supply channel, a recommendation was developed to improve its operation. The results of surveys of the hydraulic and alluvial regimes of sediments in the channel of supply channels are analyzed and summarized as well as the organization of cleaning work and recommendations for the appropriate placement of dredgers along the channel length. The arrangement of dredgers is carried out depending on the distribution of sediment volumes along the length of the channel, taking into account the type and performance of each dredger.
Reference20 articles.
1. Mukhammedov YA. Ekspluatatsiya S. Karshinskogo magistral'nogo kanala pri vodozabore iz r. Amudar'i i puti yego uluchsheniya. http://www.cawater-info.net/library/rus/mukhamedov1.pdf.
2. Bazarov D. R., Norkulov B. E., Markova I. M., Yermilov M., and Tadzhiyeva D. O. About constructions for the protection of water supply channels from sediment load and driftwood. Agricultural Scientific Journal, (8), pp. 69-75. (2019)
3. Nagata N., Hosoda T., & Muramoto Y. Numerical analysis of river channel processes with bank erosion. Journal of Hydraulic Engineering, 126(4), pp.243-252 (2000)
4. Cantelli A., Wong M., Parker G., and Paola C. Numerical model linking bed and bank evolution of incisional channel created by dam removal. Water Resources Research, 43(7). (2007)
5. Darby S. E., Alabyan A. M., & Van de Wiel M. J. Numerical simulation of bank erosion and channel migration in meandering rivers. Water Resources Research, 38(9), 2-1. (2002)