Control of Time, Cost and Quality of Construction Project Management

Author:

Asfoor H.M.A.,AL-Jandeel A.A.T.,Igorevich K.K.,Ivanovna L.A.

Abstract

One of the most common methods of projects management of the implementation of construction projects is the Project Management Triangle (PMT), this method give the balance between the three heads of this triangle time, cost and quality. In addition, the main principle is integrating the design and construction phases in a parallel way, where the basic elements of the project time, cost and quality will not be influenced by each other. some of the projects are established by some construction companies in developing countries in the world have been failed to manage and solve the weaknesses points in these projects and sometimes failures due to the increase in cost or the low level of quality, as found by the field survey. Therefore, the research aim is to develop and apply the general planning mechanisms of the project to get the development of projects detailed plans to control the factors time, cost and quality of the executed works. The main results of the study were, depending on the choice of the target function, can give early or late start times by linear programming solutions for all nodes or events in the project domain; so the early start times of the project should be determined first. The supposed project domain includes a number of nodes ranging from (1-m), as node (1) led to represent the opening of the project activity work and node (m) represent the end of the project and that will be found the balance between the (PMT) elements.

Publisher

EDP Sciences

Subject

General Medicine

Reference18 articles.

1. Actual Problems of Management Quality Control of a Construction Company

2. Shirina E, Gaybarian O, Myasischev G 2017 Effective management of construction company in terms of linguistic communication IOP Conf. Series: Earth and Environmental Science 90012077.

3. Klyuchnikova O V, Kostyuchenko V V, Pobegaylova E V 2014, Organization management from psychological components to its structuring (Rostov-Don).

4. Klyuchnikova O V 2013 The effectiveness of the project excavate for laying utility networks Inženernyj Vestnik Dona 4 URL:http://www.ivdon.ru/ru/magazine/archive/n4y2013/2072.

5. Encyclopedia of the Don region The jubilee album devoted 70 years the Rostov region (Rostov-Don).

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3