Author:
Mukhamedova Ziyoda,Ergasheva Zakhro,Barotov Jamshit,Ergasheva Vasilya,Abdullaev Rustam
Abstract
Purpose: To stabilize the departure of trains on schedule, to do this, to justify the size of the factor of unevenness taken into account when normalizing the duration of the main technological operations with the compositions of container block trains for departure at the junction stations. Methods: From the existing automated systems, statistical data were collected and processed using MS Excel software, and the mathematical expectation, standard deviation, and dispersion of the duration of operations with the block train at the departure station were determined. The hypothesis about the normal law of distribution of the random variable of the duration of each of the main operations at the station was tested by the “chi-square” goodness-of-fit test. Results: The distribution of the random variable of the duration of operations at the station is described using the normal distribution law; a technological schedule for processing the composition of the container block train on the tracks of the railway junction station was built. Practical significance: Practical recommendations will reduce the technological norms for the processing time of a container block train on the tracks of a railway junction station. As a result, the processing time for block trains on departure on the station tracks will be reduced from 154 minutes to 132 minutes, which will save time by 22 minutes.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献