Author:
Makovetskaya Elena,Deniskina Antonina,Krylov Egor,Urumova Fatima
Abstract
The comparative analysis of two options for investment and construction projects, with partial robotization of production and traditional work organization was conducted on the criterion of time and cost minimizing the of construction. The use of two robot types was considered, a bricklayer and a plasterer robot. As a comparison result of main quantitative indicators of construction organization plan, it was found that the use of robots reduced the duration of construction, expenditures and labor costs. Lack of fatiguability, lunch breaks, smoke breaks, conversations, illnesses, as well as round-the-clock operation, the absence of malicious intents, no theft and, therefore, procedural violations, composition disorders, etc., allows to look at the introduction prospect of construction robots with optimism.
Reference15 articles.
1. Pykhtin K., Simankina T., Sharmanov V., Kopytova A., IOP Conference Series: Earth and Environmental Science, 012065 (2017)
2. Воск T., Boulgakov A., Parshin D., Proc. of the 22-th Intern. Symp. on Autom. and Robot, in Construe(ISARC-2005, Ferrara, 2005)
3. Valitova I., Trofimova T., Simankina T., Stein E., MATEC Web of Conferences, “International Science Conference SPbWOSCE-2017 “Business Technologies for Sustainable Urban Development””, 01068 (2018)
4. A novel surface segmentation approach for robotic manipulator-based maintenance operation planning
5. CLIBOT – ein seilkletternder Roboter zur Bauwerksinspektion
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献