Author:
Nepomnyashchikh Evgeny V.,Kirpichnikov Konstantin A.,Komisarchuk Galina S.,Efimova Sophia A.
Abstract
The maintenance and development of railway infrastructure requires a significant amount of repair and construction work. The most labour-intensive and time-consuming type of repair is a major track repair. The development strategy of the track complex sets tasks for planning and organizing track repair work, taking into account the fulfilment of the requirements for highly efficient use of track machines, ensuring their production at the level of passport characteristics. The article discusses the problem of dismantling a rail and sleeper grid using a laying crane, namely the process of lowering the first link of the package onto the crane platform. In a curved section of track, the problem arises that the inverted rail does not reach the platform rollers. Equipping the platforms with additional removable catchers will eliminate the process of rocking the inverted link by track fitters.
Reference7 articles.
1. Issues of Planning Work on the Current Maintenance of the Railway Track
2. On the Issue of Criteria for the Purpose of Capital Repairs of the Railway Track
3. Kirpichnikov K. A., Nepomnyashchikh E. V.; Kirpichnikov K. A., Nepomnyashchikh E. V., Design of the organization of construction of a new railway line: a textbook on the discipline “Organization, planning and management of railway construction” for full-time and part-time students of the specialty 271501.65 “Construction of railways, bridges and transport tunnels” (Chita: ZabIZhT, 2012)