Author:
Sokolov Mikhail,Karablin Mikhail
Abstract
The results of engineering and geological surveys to the ground base of a mining and technical building, composed of man-made filled-up ground, are presented. A simulation of the stress-strain state of a fixed ground base was carried out. The analysis of changes in the geomechanical state of the ground massif as a result of injection compaction is presented, on the basis of which recommendations are given on adjusting the parameters of the injection technology.