Author:
Sysoev Andrey,Zlobina Elena,Katanov Igor,Kretschmann Jurgen
Abstract
Under the conditions of a combined mining system overburden is developed using a transport and non-transport technologies, specific costs for non-transport technology are lower than transport costs. The change in the non-transport bench height led to the redistribution of the volumes of transport and non-transport overburden. With an increase in the volume of non-transport overburden, the share of more expensive transport overburden is decreases, while the technical and economic indicators of the non-transport zone deteriorate due to an increase in re-excavation volumes. The change in the non-transport bench height affects the recasting ratio and the annual advance coal face line, which determine the cost of developing the overburden. This article presents the results of a study of the laws of change in the recasting ratio and the annual advance coal face line, depending on the non-transport bench height within a combined mining system of flat seam. The obtained patterns were established as a result of solving problems of substantiating typical excavation schemes of the direct dumping method and developing a mathematical model for identifying excavation schemes with the subsequent calculation of their technological indicators.
Reference15 articles.
1. Mirabediny Н., A dragline simulation model for strip mine design and development (University of Wollongong, Australia, 1998)
2. Erdem B., Çelebi N., Pasamehmetoglu A.G., TIMNAQ, 107, A13 (1998)
3. Numerical modeling of overburden rehandling with draglines