Accelerate the Implementation Time of Kadiri University Clinic Constructions Projects Using Critical Path Method (CPM)

Author:

Muhammad Azhari Faiz,Iwan Candra Agata,Aprillia Karisma Dwifi,Yamin Ashabul,Rahmawaty Fitry

Abstract

The efficiency of project implementation time becomes one of the efforts in optimizing the use of implementation time. CPM is one of the network methods used to determine the critical path of each implementation. This research aims to optimize Time by applying CPM methods in the Kadiri University Clinic construction project in Kediri. The project consists of 2 floors with 12 essential items of work. The implementation time of the project is planned to be complete for 134 days. The data used in this study form a project schedule (Gantt chart). From the data, analysis of the sequence of implementation using the Work Breakdown Structure (WBS) method and carried out the calculation of earliest start (ES), latest start (LS), earliest finish (EF), and latest finish (LF). Critical paths are known from slack/float calculations and are depicted in the form of network diagrams. From the analyses, it is known that the project can be complete within 71 days. The results were 63 days earlier than planned. With the use of the CPM method in project scheduling, optimal timing and critical implementation are found. So that it can be used as a reference in the performance of the project implementation.

Publisher

EDP Sciences

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3