1. JTG/T D65-1-2007. Guidelines for Designo f Highway Cable-Stayed Bridge [S].
2. JTG F80/1-2004. Standard for quality inspection and assessment of highway engineering[S].
3. Jun Shi, Yue ZhaoClosure Technology of Huiqing Yellow River Bridge[J]. Construction Technology. 2011(05):44-48.
4. WEI Zuo-ming, MENG Fang-cheng, CHEN Wen Linear Sensitivity Analysis at Construction Phase of Extradossed Cab1e-stayed Bridge[J]. Western China communication Science and Technology. Bridge and Tunnel engineering. 2014(06):65-68.
5. ZHAO Fu-xing The analysis and research on construction control of low-pylon cable-stayed bridge[J]. Hei Long Jiangjiaotong keji. 2016(02):80-81.