Study of factors affecting construction quality, cost, and time in building project using analytical hierarchy process (AHP)

Author:

Nurlia Ramadhanty,Yureana Wijayanti,Putri Arumsari

Abstract

The building construction is a very complex project which requires the collaboration of many project participants and various resources. It is important to identify and mitigate the problems in the project that can hamper the performance of construction such as delay, cost overruns, and low quality. The objective of the study is to determine the factors in building construction projects that can affect cost, quality, and time performance. The method used in this research is the Analytical Hierarchy Process (AHP) to analyze the dominant factors causing the constraints. A structured hierarchical matrix was developed based on a preliminary identification of factors affecting time, cost, and quality, and then evaluated by experienced professionals during the survey. The data obtained from the questionnaires were processed using Expert Choice 11 software. Based on the results of the study, it was found that there are five dominant factors affecting the time, cost, and quality constraints, such as the design changes from the project owner during construction phases, planning error, delay in payment, work plan changes during construction phases, and unpredictable bad weather condition. This study also presented the mitigations to these factors, which were obtained both from the interviews with experts and also from the previous literature studies.

Publisher

EDP Sciences

Subject

General Medicine

Reference17 articles.

1. Center for Data and Information Technology, PUPR infrastructure statistics information book 2020 (Minister For Public Works and Human Settlements, 2020) https://data.pu.go.id/buku-informasi-statistik-infrastruktur-pupr-tahun-2020

2. Project risk management in the construction of high-rise buildings

3. Ramadhan R.P., Business and Finance Journal 5(1) (2020) https://doi.org/10.33086/bfj.v5i1.1489

4. AHP based multi criteria decision analysis of success factors to enhance decision making in infrastructure construction projects

5. Indonesian Central Government, Government regulation of the Republic of Indonesia number 29 of 2000 concerning the implementation of construction services (PP No.29 TH 2000)

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3