Abstract
With the continuous development of oil fields, the remaining oil in conventional old oil fields is gradually reduced after long-term water drive development. Fracturing can change the original water drive flow channel and increase the oil production of oil Wells. After long-term water flooding development, the oil production of oil Wells in Block X of Daqing oilfield has gradually decreased, and fracturing is needed to increase production. However, Block X has three target reservoirs, and the two formations are close to each other, so stratified fracturing cannot be realized by conventional stage fracturing technology. Therefore, flow limiting method is needed to control the fracture initiation of oil formations. And each layer can be better used. The overall fracturing effect is poor, and it is necessary to carry out a separate optimization design for the control technology of fracture height. The overall fracturing sequence is: first press the third stage, then press the first stage and the second fracturing stage. There is no interference between the 19th layer and the 20th layer, and the fracturing effect is good. For the 19th small layer, the fracture half-length is about 48m, and the 20th small layer half-length is about 55m, which achieves the expected fracturing effect.