Abstract
The paper deals with network programming method and its application for solving multi-extreme and discrete optimization problems in Project Management. The purpose of the paper is to develop a new approach to solving optimization problems, called the network programming method and to solve a number of optimization problems of project management based on this method. This method is used to solve the problem of building a business-supporting project portfolio. The life cycle of a building project can be represented as a great number of interrelated and interacting actions leading to the achievement of the set goals in the presence of existing constraints (resources, time, cost, quality, reliability, safety, etc.). Such a representation is called a network representation. On the basis of the network programming method and its special case - the dichotomous programming method, new algorithms for solving a number of optimization problems in project management are proposed. The proposed method makes it possible to use it in solving the problems of managing the life cycle of a construction object. It can be used not only throughout the entire life cycle, but also independently during the planning, implementation and completion phases of project management.
Reference20 articles.
1. Blackburn S., of Project J. Management 20, 3 (2002).
2. Bagshaw K., J. of Operations Research 11 (2021).
3. Burkov V., Burkova I., Dichotomous programming method in optimization problems (Central Economic and Mathematical Institute of the Russian Academy of Sciences Moscow, Russia, 2003).
4. Burkov V., Burkova I., Popok M., Ovchinnikova T., Annals of the Institute of Management Problems under V.A. Trapeznikov of the Russian Academy of Sciences 3 (2005).
5. Burkova I., Automation and Remote Control 70 (2009).