Efficiency of reinforcement of transition sections on the railroad by the developed constructions

Author:

Mekhmonov Mashkhurbek,Makhamadjonov Shukhratjon,Uralov Akmal

Abstract

The article gives the reasons of occurrence and origin of defects of railroad track structure elements on approaches to bridges. The defects arising on sleepers and intermediate fasteners of the track structure and the costs obtained as a result of early replacement of the track structure elements on the transition sections are calculated. As a result of the received constructive decision the technological process of driving of reinforced concrete piles in an embankment for the purpose of maintenance of safe and reliable work of sleepers and intermediate fastenings during service life in 3 m on a transition section is developed. As a result of implementation of the developed design in 1384 transition sections, the economic efficiency amounted to 447.638 million sums. As a result of reinforcement of the transition section, the cost of current and lifting repair of the track is reduced.

Publisher

EDP Sciences

Reference31 articles.

1. Typical technically justified time standards for accounting for work on the current maintenance of the path. GAZHK “Uzbekistan temir yullari”. Management of the track economy. (Tashkent 2013)

2. Earthquake resistance of culverts of railways of Uzbekistan

3. Investigation of the period of natural oscillations of the embankment on approaches to bridges

4. Reducing impact of embankment soils on shore support of bridge on the approaches to bridges

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3