Author:
Nalimova Alexandra,Alyeva Marina
Abstract
The article is devoted to the study of the features of quality control of the organization of construction processes based on the use of information technologies. The construction period is key to ensuring the design characteristics of capital construction projects. It is this stage of the life cycle that characterizes the adequacy of the organizational and managerial decisions made (the organizational and technological sequence of construction) and determines the actual quality indicators (functional efficiency and operational reliability) of the completed construction objects. Statistics of studies of cases that led to the manifestation of deviations from the established (design) quality indicators show that a decrease in the quality of construction products (including an increase in the duration of construction production) is almost never the result of any one, but occurs as a result of the interaction of several different negative factors (groups of negative factors). A special emphasis is placed on the technology of automated computer modeling (BIM technology), which accompanies all stages and stages of construction. It is noted that automated management can be either short-term, designed for the current year, or in the form of a long cycle.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献