Planning, scheduling, & allocation of resources for short-span bridge using Primavera P6

Author:

Gopal Bandi Sri Ram,Reddy V. Srinivasa,Rao M.V. Seshagri,Sujatha Thirumala,Alawadi Ahmed Hussien Raide,Anthwal Tushar

Abstract

The paper states the advantages of web-based Primavera P6 for structural planning and scheduling Bridge building framing the problems and difficulties experienced in the construction schedule and resource availability. Only Bridge Design and Plannings taken for the project consideration. After the detail creation of Bill of Quantities of the proposed bridge. Here the Bridge consists of four spans only. Each Span is of 10.4 m length. Bridge is located at Yellareddy Tank Bund Portion, Nizamabad district (Hyderabad-Medak-Bodhan). The Resource Planning is the creation of Organization Breakdown Schedule (OBS) and Enterprise Project Structure (EPS) of the project and also to create Work Breakdown Schedule (WBS) and to insert the corresponding activities and schedule them on the basis of created calendar and need to level/smoothen the resources and make effective use of them. Organization Breakdown Schedule (OBS) and Enterprise Project Structure (EPS) of the project has been created Work Breakdown Schedule (WBS) and the corresponding activities are created and need to schedule their resources to activities on the basis of created calendar and need to level/smoothen the resources. Resource Scheduling involves the Scheduling of Project and Activity Network Diagram. Resource allocation enables you to allocate equipment, labor, and material expenditures to your timetable. The reports in Primavera P6 may be used to track resource allocation and potential over-allocation of labor resources.

Publisher

EDP Sciences

Subject

General Medicine

Reference16 articles.

1. Chopra Satinder, Dewangan Arvind, International Journal of Innovative Research in Science, Engineeringand Technology (An ISO 3297: 2007 Certified Organization) Vol. 3, Issue 7, (2014)

2. Dhanalakshmi V., International conference onengineering innovations and solutions(ICEIS - 2016)

3. Esakki Thangam P., Magdalene Benila R., IJSTE - International Journal of Science Technology & Engineering | Volume 2 | Issue 11 | (2016)

4. Optimized power generation in solar using carbon substrate for reduced greenhouse gas effect

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3