Changes are a common phenomenon in the construction industry, impacting the project's cost, time, and performance. The purpose of this work is to a comprehensive review relating to variation order causes. Also, the aim here is to determine variation order causes in the building’s construction. More importantly, explore the relationship between these causes. However, the importance of specifying the causes for change orders is the first step in managing variation orders to reduce the harmful effect on a project. The field survey was conducted for several institutions such as health (Karkh’s health), higher education (University of Baghdad and University of Kufa). As a result, a field visit was made to the project sites. They were then, Conducting interviews with the resident engineer, the consultant, and the contractor. A developer tool called cause (variation orders) breakdown structure (CBS) included 12 causes at the first level, including 103 sub-causes. There is a relationship between the variation orders causes, which is evident in the third level. The study recommends adopting (CBS) a comprehensive reference for variation order causes in projects due to facilitating their management processes. Future research could examine the relative importance of variation order causes, in addition to using a fuzzy cognitive map to find the extent of each cause’s influence on the other.
Reference33 articles.
1. Oyewobi L.O., Jimoh R., Ganiyu B.O. and Shittu A.A., 2016. Analysis of causes and impact of variation order on educational building projects. Journal of Facilities Management.
2. Alsuliman J., Bowles G., Chen Z. and Smith S.D., 2012. Current practice of variation order management in the Saudi construction industry. Association of Researchers in Construction Management, pp.1–10.
3. Sunday O.A., 2010, September. Impact of variation orders on public construction projects. In Proceedings of the 26th Annual ARCOM Conference (pp. 6–8). Leeds: Association of Researchers in Construction Management.
4. Hasan B., Jrad F. and Ahmed S., 2010. Study the causes of formal change orders and analyze their impact on building projects: the case of Syria.