Author:
Avetisyan Robert,Khalil Muhammad,Galaeva Natalya,Kazaryan Ruben
Abstract
Construction reorganization, as a type of high-rise construction is part of a basic reorganization cycle in which four phases (phases, states, technological redistribution) are consistently implemented: device, disorganization, reorganization and co-organization. Loft style methodology: the integrated performance indicator organizational and technological operational reliability (OTOR) of the Loft room, which is determined with the help of stellar infographic models, makes it possible to prove arguably the necessity or absence of the need to reorganize the former industrial building. The assessment of the functional zone of the level of the OTOR indicators in the system of the infographic model, in which the number of axes emanating from the point “zero”, corresponds to the number of parameters characterizing a specific functional zone. Valuation parameters are ranked in accordance with their tendency towards centripetal and centrifugal. The field of our research lies in the phase of reconstruction. The determination of the level of OTOR of one functional zone is formed by the construction of two infographic star-shaped models, one of which is constructed by centripetal indicators, and the other by centrifugal indicators.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献