Verification of the regulatory distribution of unit value and labor intensity of design works in thermal power construction

Author:

Voronkov Ivan,Ostrovskii Roman,Nikolaev Georgy

Abstract

The authors of the study compared the cost distribution of developing construction documentation for buildings, structures, and various work types involved in the design of combustion power plants. They used data from the state-estimated standard RBPD 81-2001-23 “Reference book of basic prices for design works in construction “Energy facilities. Energy generation” and compared it with the actual labor intensity distribution data from the design of buildings and structures at the Svobodnenskaya Thermal Power Plant (TPP). Based on the study’s findings, the authors confirmed that, to some extent, the current regulatory distribution of the unit value of work in thermal power construction aligns with the actual labor intensity. Moreover, they identified groups of buildings where this regulatory distribution is not supported by the real design data. As assumptions based on the results of the study, it is proposed by the authors to classify buildings and structures in accordance with the KKS coding system and also to supplement the existing model of distribution of the unit value of design work by buildings and structures with a dependence on the value of the electric capacity of the station.

Publisher

EDP Sciences

Reference16 articles.

1. Structure of realised risks of projects for construction nuclear power plant by Rosatom State Corporation in 2010-2020

2. Factors affecting construction project complexity.

3. Karakozova I.V., Pavlov A.S., Temishev R.R., On a new methodology for determining the cost of a construction project, Energy: Economy, Technology, Ecology 4, (2021). DOI 10.7868/S0233361921040078.

4. Belyakov S.I., Shabalkin B.V., Formation of cost estimate for project estimate documentation, Moscow Economic Journal 8, (2019). DOI 10.24411/2413-046X-2019-18073.

5. Atnyukova P. V., Presnyakov I. V., Tolstoukhov D. A., Approaches to the Assessment of the Cost for the Construction of Innovative Nuclear Power Facilities at the Early Stages of Design, Atomic Energy, (2023).

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3