1. Adamu M.O. and Abass O., Parallel machine sheduling to maximize the weighted number of just-in-time jobs.J. Appl. Sci. Technol.15(2010) 12–34.
2. Adamu M.O. and Adewumi A., Metaheuristics for scheduling on parallel machine to minimize weighted number of early and tardy jobs.Int. J. Phys. Sci.7(2012) 1641–1652.
3. Adamu M. and Adewunmi A., A Comparative study of metaheuristics for identical parallel machines.J. Eng. Technol. Res.5(2013) 207–216.
4. P. Baptiste, A. Jouglet, CL. Pape and W. Nuijten,A constraint based approach to minimize the weighted number of late jobs on parallel machines.Technical Report 2000/228, UMR, CNRS 6599, Heudiasyc, France (2000).
5. Belouadah H., Posner M.E. and Potts C.N., Scheduling with relates dates on a single machine to minimize total weighted completion time.Discrete Appl. Math.36(1992) 213–231.