Abstract
Developing management rules to improve downstream migration of salmon smolts in large hydropower plants is essential to limit mortality and migration delay. A 2-year telemetry study was conducted to assess the efficiency of temporary measures to enhance the safety and speed of juvenile salmon passage through the Poutès dam (Allier River, France). 124 smolts were tracked through the reservoir and downstream of the dam, during implementation of turbine modulation and/or shutdown during night and reservoir level lowering. Level lowering significantly reduced median residence time from 3.4 days to 4.4 hours. However, even with high spill during turbine modulation, the risk of smolt being drawn toward the turbines was increased at low reservoir level due to the site's configuration, greater proximity to the surface and weak repulsive effect of the rack. Moreover, results revealed that a substantial proportion of smolts can migrate during daytime and twilight during floods, even at the beginning of the migration period. Thus targeted turbine shutdown has a good potential to protect smolts, but implementation requires studies taking account of site specificities and a flexible approach.
Subject
Management, Monitoring, Policy and Law,Nature and Landscape Conservation,Water Science and Technology,Ecology,Aquatic Science
Reference65 articles.
1. Movements of two strains of radio tagged Altlantic salmon, Salmo salar
L., smolts through a reservoir
2. Arevalo E, Lassalle G, Tétard S, Maire A, Sauquet E, Lambert P, Paumier A, Villeneuve B, Drouineau H. 2020. An innovative bivariate approach to detect joint temporal trends in environmental conditions: Application to large French rivers and diadromous fish.
Sci Total Environ
141260.
3. Babin AB, Ndong M, Haralampides K, Peake S, Jones RA, Curry RA, Linnansaari T. 2020. Migration of Atlantic salmon (Salmo salar) smolts in a large hydropower reservoir.
Can J Fish Aquat Sci.
4. Bach JM, Bruyère F, Poupard PY, Rancon J. 2000. Etude du franchissement (dévalaison − montaison) du complexe hydroélectrique de Poutès − Monistrol par les saumons en 1999. LOGRAMI, Saint Pourçain sur Sioule.
5. Bach JM, Caut I, Lelièvre M, Viallard J. 2004. Suivi de la dévalaison 2004 des saumoneaux au droit du barrage de Poutès. LOGRAMI, Saint Pourçain sur Sioule.