Abstract
This paper deals with the Extended Resource Constrained Project Scheduling Problem (ERCPSP) which is defined by events, nonrenewable resources and precedence constraints between pairs of events. The availability of a resource is depleted and replenished at the occurrence times of a set of events. The decision problem of ERCPSP consists of determining whether an instance has a feasible schedule or not. When there is only one nonrenewable resource, this problem is equivalent to find a feasible schedule that minimizes the number of resource units initially required. It generalizes the maximum cumulative cost problem and the two-machine maximum completion time flow-shop problem. In this paper, we consider this problem with some specific precedence constraints: parallel chains, series-parallel and interval order precedence constraints. For the first two cases, polynomial algorithms based on a linear decomposition of chains are proposed. For the third case, a polynomial algorithm is introduced to solve it. The priority between events is defined using the properties of interval orders.
Subject
Management Science and Operations Research,Computer Science Applications,Theoretical Computer Science