Abstract
New energy aircraft is a trend of aircraft development in the future. More and more countries and enterprises have carried out relevant research. This article summarizes the characteristics of the civil aircraft program life cycle development and combining with the technical characteristics of new energy aircraft, this risk management method based on RBS is proposed. Through analytic hierarchy process (AHP), quantitative assessment of the total risk of the project, this method can comprehensively quantitatively identify the typical risks in the whole life cycle, provide a feasible method for risk management of the new energy civil aircraft project.
Reference5 articles.
1. NASA. Program and Project Management processes and Requirements, (1998)
2. ECSS. Space Project Management: Risk Management, (2001)
3. Chen Guo-hua. Risk Engineering [M]. Beijing: National Defence Industry Press, (2007)
4. Jackson S. Systems Engineering for Commercial Aircraft. Routledge, Surrey. (2016)
5. Authors S. INCOSE systems engineering, (2013)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献