Author:
Naderia Bahman,Goharib Sheida
Abstract
Conventionally, in scheduling problems it is assumed that each job visits each machine once. This paper studies a novel shop scheduling called cycle shop problems where jobs might return to each machine more than once. The problem is first formulated by two mixed integer linear programming models. The characteristics of the problem are analyzed, and it is realized that the problem suffers from a shortcoming called redundancy, i.e., several sequences represents the same schedule. In this regard, some properties are introduced by which the redundant sequences can be recognized before scheduling. Three constructive heuristics are developed. They are based on the shortest processing time first, insertion neighborhood search and non-delay schedules. Then, a metaheuristic based on scatter search is proposed. The algorithms are equipped with the redundancy prevention properties that greatly reduce the computational time of the algorithms. Two sets of experiments are conducted. The proposed model and algorithms are evaluated. The results show the high performance of model and algorithms.
Subject
Management Science and Operations Research,Computer Science Applications,Theoretical Computer Science
Reference22 articles.
1. Baker K.J.,
Introduction to Sequencing and Scheduling.
Wiley,
NewYork, USA
(1974).
2. Błazewicz J.,
Ecker K.H.,
Pesch E.,
Schmidt G. and
Weglarz J.,
Handbook of Scheduling: From Theory to Applications.
Springer,
Germany
(2007).
3. Bruker P. and
Kampmeyer T., Tabu search algorithms for cyclic machine scheduling problems, in
The Fifth Metaheuristics International Conference, Japan
(2003).
4. A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line
5. Hybrid tabu search for re-entrant permutation flow-shop scheduling problem
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献